Kairakkum Hydropower Plant – Feasibility Study
Klijent:
European Bank for Reconstruction and Development
Lokacija:
Tajikistan
Trajanje projekta:
21.11.2012 - 26.10.2013
Usluge:
Feasibility study Climate resilience study
Download
Feasibility study for the rehabilitation and upgrading of the 126 MW
Kairakkum hydropower plant on the Syrdarya River. Special consideration
to strengthening the power plant’s resilience against climate change
effects (PPCR study – Pilot Programme for Climate Resilience, launched
under Climate Investment Funds CIF).
Kairakkum hydropower plant on the Syrdarya River. Special consideration
to strengthening the power plant’s resilience against climate change
effects (PPCR study – Pilot Programme for Climate Resilience, launched
under Climate Investment Funds CIF).